Pteris’ Project Executive team is experienced in Airport logistics and Materials handling project.
Since first air cargo handling project (CHS) for CSA in 1991, Pteris has undertaken various large scale CHS projects for airports and airlines in China market. The CHS system now be used stably in the top 4 busiest airport of China: Shanghai, Guangzhou, Beijing, Shenzhen.
Highlight: From 2008 till now, Shanghai Pudong International Airport ranked at 3rd position for 5 years in the world. In 2013, it’s annual cargo handling over 3.5 million tons. All the ULD cargo handling system in Pudong airport are supplied by Pteris
Mature team and flexible method for mega project management
Well equipped with advanced system design and accumulated consulting services in China CHS
Professional and full series of technical design team and quick response for customized requirement in CHS
Self-Manufacturing capability and facility to assure project’s milestone
System designer, in charge of requirement analysis, flow analysis and design, layout design, system simulation.
Computer and software engineer, in charge of project’s IT structure design, management software development, system control software development, interface design and implement. Control engineer, in charge of PLC and manual level control logic design.
Commissioning engineer, in charge of site commissioning, be experienced.
Senior mechanical designer, in charge of equipment’s layout design and detailed layout design.
Mechanical designer, in charge of simple equipment and part design.